wordpress-seo
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /nas/content/live/illong/wp-includes/functions.php on line 6114Scope
The Station at St. Paul’s is a newly renovated existing office building for their outreach ministries. The building houses Winston-Salem Read offices, multiple conference and meeting spaces, a large kitchen and storage.
Highlights
Highlights include that the building was designed by national recognized architect George Matsumoto in 1960 for the IBM Corporation.