Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /nas/content/live/illong/wp-includes/functions.php on line 6114
Wake Forest University - Graylyn Mews - I.L. Long Construction Co., Inc
Project Location

Winston-Salem, NC

Square Footage

10,000

Schedule Duration

8 months

Scope 

The Mews at Graylyn renovation included major updates to the historical hotel’s building systems and aesthetic upgrades throughout.

 

Highlights

Highlights include renovation of the dining and conference room, concierge lounge, gift shop, bridal suite, presidential suite and silo suite.