Scope
The project consists of a new indoor pool addition which encloses a warm water L-shaped pool with swimming lanes and a connected zero entry. A separate 1,445 SF Teen Room addition was constructed on the back side of the existing building. The new additions were constructed with CMU and a brick veneer to match the existing building.
Highlights
Highlights includes all new pool equipment and a new dehumidification system to improve air quality in the pool.