Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /nas/content/live/illong/wp-includes/functions.php on line 6114
Clemmons Library - I.L. Long Construction Co., Inc
Project Location

Clemmons, North Carolina

Square Footage

18,895

Schedule Duration

14 Months

Scope 

This project consists of the construction of a new branch library for the Forsyth County Library system in the Village of Clemmons. The new library includes an inviting space with computer workstations and comfortable seating areas throughout. Also included are designated break out spaces around the perimeter equipped with technology for meetings, group activities or quiet rooms. Additionally, the circulation desk is centrally located for direct access from all areas of the library.

 

Highlights

Separate children’s stack area with a room specific for kid’s programming organized throughout the library.

High ceilings maximizing the light filtering in through the large windows to increase natural light.