Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /nas/content/live/illong/wp-includes/functions.php on line 6114
2021 Starnet Design Winners - I.L. Long Construction Co., Inc
July 1, 2021

2021 Starnet Design Awards Hospitality category winners!

A large renovation has been taking place at Centenary United Methodist Church. This project’s focus was the rehabilitation of a large portion of the Sunday School building that houses the children’s and youth ministries.

The church was originally constructed in 1930 with a significant addition in 1960. Lots of exterior work took place as well but the interior renovations were extensive and included over 37,000 sf of the approx. 100,000 sf building. All 3 floors of the 1960 addition were completely renovated.

The entire 4th floor of the 1930’s original building was fully reconfigured and renovated. You can view the full article here. Centenary Youth Kitchen